DAY3: Excavation continuing
- pulethabang733
- Sep 27, 2022
- 1 min read
Updated: Sep 28, 2022
It was a very hot morning we spent the early session before lunch continuing with our excavation we used shovels and picks to dig the excavations to the required width, length and depth. after we were done with excavations it was not yet lunch time so we took the site levels using the dumpy level.

After lunch the groups were now swopped so we moved from construction site and went to work in existing buildings. We were tasked to build a scaffolding, so we collected the parts from site office to the site for the rest of the day.
Reported by Pule
Comments